Enel Green Power starts operating the Morro do Chapéu Sul II wind farm in BA
The project has 353 MW of installed capacity and will be able to generate more than 1,800 GWh of energy per year
Is electric mobility more competitive than fossil fuels?
The value per km driven for a combustion car in the country is R$ 0.49, while the cost of an electric vehicle is R$ 0.12
Voting on PL 5829 in the Senate is postponed for health reasons of the rapporteur
Bill that provides for the creation of the Legal Framework for DG (distributed generation) in Brazil was scheduled to be voted on today (25)
Growatt launches charger for electric vehicles
EV Charger THOR is compatible with all brands and supports three different charging modes
Understand stringboxes with multiple inputs and multiple outputs
There are variations of stringboxes that do not join strings, but offer protection and sectioning functions.