• Tuesday, July 14, 2026
Facebook X-twitter Instagram Youtube LinkedIn Spotify
  • GC Solar: 22,51 GW
  • GD Solar: 49,74 GW
  • advertise here
  • About Us
  • Expedient
logo site solar channel
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric Vehicles
  • Articles
    • Opinion Article
    • Manufacturer's Article
    • Technical Article
  • Latam
  • Batteries
  • Blog
  • Solar Energy Companies
    • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Firmare
  • Courses
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric Vehicles
  • Articles
    • Opinion Article
    • Manufacturer's Article
    • Technical Article
  • Latam
  • Batteries
  • Blog
  • Solar Energy Companies
    • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Firmare
  • Courses
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric vehicles
  • Articles
    • Opinion
    • technicians
    • Manufacturer Items
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • About Us
  • Advertise Here
  • CS Consulting
  • Courses
  • International market
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric vehicles
  • Articles
    • Opinion
    • technicians
    • Manufacturer Items
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • About Us
  • Advertise Here
  • CS Consulting
  • Courses
  • International market
logo site solar channel
Home / News / Politics & Regulation / ONS will have a special operation and will release bulletins on energy consumption during the World Cup.

ONS will have a special operation and will release bulletins on energy consumption during the World Cup.

This action is part of a special operation to monitor load variations and ensure the country's energy security during the World Cup.
Follow on Whatsapp
  • Photo by Henrique Hein Henrique Hein
  • June 11, 2026, at 16:55 AM
3 min 22 sec read
Canal Solar - ONS will release bulletins on energy consumption during the World Cup.
Photo: ONS/Disclosure

The ONS (National Electric System Operator) has prepared a special operation to monitor the impacts of the 2026 World Cup on energy consumption in Brazil.

During the main games of the competition, the agency will release bulletins with analyses of load behavior in the SIN (National Interconnected System).

The reports will be available on the Operator's website after the matches and will provide consolidated data on consumption variations recorded before, during, and after the games.

In the first phase, the special monitoring will cover the Brazilian National Team's matches on June 13, 19, and 24. The operation will also include the semifinals, scheduled for July 14 and 15, and the final, on July 19.

If Brazil advances to the knockout stages, the same procedures will be adopted in subsequent matches. The operational bulletins during the World Cup can be accessed by clicking [here]. here

How do games affect energy consumption?

According to the operator, high-audience events, such as matches of the Brazilian National Team and decisive phases of the World Cup, cause significant changes in the load behavior of the electrical system.

Typically, about two hours before the start of the games, there is a gradual reduction in energy demand due to the shutdown or decrease in commercial and industrial activities, as well as people traveling to watch the matches.

This movement creates a downward ramp in the load that usually extends until the end of the first half. During halftime, however, the behavior is reversed.

With people temporarily leaving the television to perform household activities, such as using appliances or preparing food, there is a rapid increase in demand.

After the game ends, a new ramp-up in load is observed, requiring increased attention from system operators.

In this sense, to ensure that these fluctuations occur safely and without compromising the energy supply, the ONS (National System Operator) monitors load behavior in real time and coordinates the operation of power plants and other electrical system facilities.

The goal is to ensure that the energy supply keeps pace with the rapid variations in consumption recorded before, during, and after matches.

"During these games, it's common for the country to come to a standstill, which has a direct impact on the operation of the SIN (National Interconnected System)," explains the Director-General of ONS (National System Operator), Marcio Rea.

“But we are prepared to guarantee a safe and reliable response during the competition, ensuring that the system responds adequately to variations in societal demand. This work reinforces our planning, monitoring, and preventative actions,” he emphasized.

Other measures to ensure system security

The ONS's special operation will cover the period between two hours before and two hours after the games considered strategic for the operation of the electrical system.

During this period, no scheduled interventions that could cause load shedding or increase the risk of power supply interruptions in any region of the country will be authorized.

The exception will be for activities considered unavoidable, where postponement could pose risks to the safety of people, the integrity of equipment, or the operation of the electrical system itself.

Furthermore, the ONS will conduct continuous monitoring of weather conditions throughout the SIN (National Interconnected System), with the aim of identifying in advance regions with a higher probability of severe storms or other weather events that could affect operations.

According to the Operator, this type of special action is traditionally adopted during major national events and follows the guidelines of... Resolution No. 1/2005 from the CMSE (Electricity Sector Monitoring Committee), which establishes measures to reinforce the security of electricity supply on occasions of great importance to the country.

all the content of Canal Solar is protected by copyright law, and partial or total reproduction of this site in any medium is expressly prohibited. If you are interested in collaborating or reusing part of our material, please contact us by email: redacao@canalsolar.com.br.

energy consumption World cup storage course ONS (National Electric System Operator)
Photo by Henrique Hein
Henrique Hein
He worked at Correio Popular and Rádio Trianon. He has experience in podcast production, radio programs, interviews and reporting. Has been following the solar sector since 2020.
PreviousPrevious
NextNext

Leave a comment Cancel reply

Your email address will not be published. Required fields are marked with *

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

News from Canal Solar in your Email

Posts

Canal Solar - ANEEL Changes auction rules after a R$ 495 million shortfall among distributors.

ANEEL Changes auction rules after a R$ 495 million shortfall among distributors.

CMSE creates rules to increase transparency in energy guarantee dispatches.

CMSE creates rules to increase transparency in energy guarantee dispatches.

More news

Read More
Canal Solar - Battery auction will have Gentil Nogueira as rapporteur. ANEEL

Battery auction will have Gentil Nogueira as rapporteur. ANEEL

Special series: storing energy is ushering in the future.

Special series: storing energy is ushering in the future.

Canal Solar - ONS restricted more than 50 GWh of renewable energy during Brazil's World Cup matches.

Brazil's matches in the World Cup resulted in a net loss of more than 50 GWh of renewable energy.

It is a news and information channel about the photovoltaic solar energy sector. Channel content is protected by copyright law. Partial or total reproduction of this website in any medium is prohibited.

Facebook X-twitter Instagram Youtube LinkedIn Spotify

Site Map

Categories

  • News
  • Articles
  • Interviews
  • Consumer Guide
  • Authors
  • Videos
  • Projects
  • Magazine
  • Electric Vehicles

Channels

  • About Us
  • Contact
  • Privacy
  • Quality Policy
  • Work with us
  • Expedient
  • advertise here

Membership and certifications

Copyright © 2026 Canal Solar, all rights reserved. CNPJ: 29.768.006/0001-95 Address: José Maurício Building – Mackenzie Avenue, 1835 – Floor 3, – Vila Brandina, Campinas – SP, 13092-523

We use cookies to make your experience on this site better Find out more about the cookies we use or turn them off in your .

Receive the latest news

Subscribe to our weekly newsletter

Fill in the information above and receive your free copy of Canal Solar magazine.

Canal Solar
Powered by  GDPR Cookie Compliance
Privacy

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Cookies strictly required

Strictly Necessary Cookie should be at all times so that we can save your preferences for cookie settings.

Cookies for third parties

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.