• Tuesday, December 16, 2025
Facebook X-twitter Instagram Youtube LinkedIn Spotify
  • GC Solar: 17,95 GW
  • GD Solar: 41,3 GW
  • TOPCon Modules: $0,088/W
  • P-Type Cells: $0,034/W
  • N-Type Cells: $0,032/W
  • HJT Modules: $0,10/W
  • N-Type Wafer: US$0,128/pc
  • Polysilicon: US$ 19,00/kg
  • GC Solar: 17,95 GW
  • GD Solar: 41,3 GW
  • TOPCon Modules: $0,088/W
  • P-Type Cells: $0,034/W
  • N-Type Cells: $0,032/W
  • HJT Modules: $0,10/W
  • N-Type Wafer: US$0,128/pc
  • Polysilicon: US$ 19,00/kg
  • advertise here
  • About us
  • Expedient
logo site solar channel
  • News
    • energy storage
    • Market and Prices
    • Investments & Business
    • Policy and Regulation
  • Articles
    • Batteries
    • Photovoltaic structures
    • Photovoltaic inverters
    • Opinion
  • Renewable
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Events
  • Videos
  • Electric Vehicles
  • Consultancy
  • Academics
  • News
    • energy storage
    • Market and Prices
    • Investments & Business
    • Policy and Regulation
  • Articles
    • Batteries
    • Photovoltaic structures
    • Photovoltaic inverters
    • Opinion
  • Renewable
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Events
  • Videos
  • Electric Vehicles
  • Consultancy
  • Academics
  • News
    • Brazil
    • World
    • Technology and inovation
  • Articles
    • technicians
    • Opinion
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • Events
  • Videos
  • About Us
  • Advertise Here
  • CS Consulting
  • Canal VE
  • Academics
  • News
    • Brazil
    • World
    • Technology and inovation
  • Articles
    • technicians
    • Opinion
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • Events
  • Videos
  • About Us
  • Advertise Here
  • CS Consulting
  • Canal VE
  • Academics
logo site solar channel
Home / News / Success Stories / ARaymond supplies fastening clips for 5 MW plant in São Paulo

ARaymond supplies fastening clips for 5 MW plant in São Paulo

PowAR Cinch ® eliminates the need for tools such as electric screwdrivers and torque wrenches
Follow on Whatsapp
  • Photo by Mateus Badra Mateus Badra
  • January 24, 2025, at 11:01 AM
1 min 47 sec read
ARaymond supplies fastening clips for 5 MW plant in São Paulo
UFV Beira Rio, located in the interior of São Paulo. Photo: ARaymond/Disclosure

In 2024, UFV Beira Rio was inaugurated, located in Presidente Epitácio (SP), with an installed capacity of 5 MW and an investment of R$ 35 million. The project uses ARaymond's PowAR Cinch ® fixing clips, developed for fixed and tracker ground structures.

  •  Join the Community Canal Solar on WhatsApp. 

Rafael Ávila, account manager for the Energy segment at ARaymond Brasil, highlighted that the clips are validated and accredited by laboratories after carrying out tests with the largest module manufacturers, making these solutions unique and exclusive in the solar sector.

“They are anti-theft, and they perform fixing and grounding in a single click. On average, it takes just 30 seconds to fix a module with three people, enabling the installation of 1 MWp in four days, also with three people,” explained Ávila.

According to him, one of the great advantages of PowAR Cinch ® is that it does not require the use of special tools such as an electric screwdriver and torque wrench, only a nylon hammer is needed to fix the plates.

Furthermore, the product eliminates the need for periodic torque maintenance every six months or one year, depending on the frequency defined by the project. “After fixing the modules with ARaymond solutions, no type of maintenance is required throughout the useful life of the installation”, he highlighted.

Another interesting feature of PowAR Cinch ® is the possibility of fixing the panels from the bottom, eliminating the need for ladders and scaffolding, and preventing installers from having to walk on the panels, which can cause irreparable damage.

“UFV Beira Rio exemplifies how the use of ARaymond PowAR Cinch ® clips can optimize the installation and maintenance of solar plants, ensuring efficiency, safety and durability. These innovations are essential for the sustainable growth of the solar energy market in Brazil, providing practical and economical solutions to the challenges faced by the systems”, concluded the manager.

all the content of Canal Solar is protected by copyright law, and partial or total reproduction of this site in any medium is expressly prohibited. If you are interested in collaborating or reusing part of our material, please contact us by email: redacao@canalsolar.com.br.

fixing clips São Paulo solar power plant
Photo by Mateus Badra
Mateus Badra
Journalist graduated from PUC-Campinas. He worked as a producer, reporter and presenter on TV Bandeirantes and Metro Jornal. He has been following the Brazilian electricity sector since 2020.
PreviousPrevious
NextNext

Leave a comment Cancel reply

Your email address will not be published. Required fields are marked with *

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

News from Canal Solar in your Email

Posts

Canal Solar - UFSC tests solar generation model integrated with agricultural production

UFSC inaugurates agrivoltaic system to promote field research

50 MW floating solar power plant in China opens

50 MW floating solar power plant in China opens

More news

Read More
Electra begins operation of solar power plant in Bahia.
  • December 15, 2025
Photo by Wagner Freire
Wagner Freire

Electra begins operation of solar power plant in Bahia.

The Brazil-Bolivia interconnection will cost R$ 2,79 billion.
  • November 21, 2025
Photo by Wagner Freire
Wagner Freire

The Brazil-Bolivia interconnection will cost R$ 2,79 billion.

Matrix inaugurates 105 MWp solar power plant in Minas Gerais.
  • November 17, 2025
Photo by Wagner Freire
Wagner Freire

Matrix inaugurates 105 MWp solar power plant in Minas Gerais.

It is a news and information channel about the photovoltaic solar energy sector. Channel content is protected by copyright law. Partial or total reproduction of this website in any medium is prohibited.

Facebook X-twitter Instagram Youtube LinkedIn Spotify

Site Map

Categories

  • News
  • Articles
  • Interviews
  • Consumer Guide
  • Authors
  • Projects
  • Brazil
  • World
  • Technical Articles
  • Opinion Articles
  • Manufacturer Items
  • Electrical Sector
  • Biddings
  • Products

Channels

  • About Us
  • Contact
  • We’re hiring!
  • Privacy
  • Expedient
  • advertise here

Membership and certifications

Copyright © 2025 Canal Solar, all rights reserved. CNPJ: 29.768.006/0001-95 Address: José Maurício Building – Mackenzie Avenue, 1835 – Floor 3, – Vila Brandina, Campinas – SP, 13092-523

We use cookies to make your experience on this site better Find out more about the cookies we use or turn them off in your .

Receive the latest news

Subscribe to our weekly newsletter

Canal Solar
Powered by  GDPR Cookie Compliance
Privacy

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Cookies strictly required

Strictly Necessary Cookie should be at all times so that we can save your preferences for cookie settings.

Cookies for third parties

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.