• Tuesday, May 12, 2026
Facebook X-twitter Instagram Youtube LinkedIn Spotify
  • GC Solar: 22,32 GW
  • GD Solar: 47,45 GW
  • advertise here
  • About us
  • Expedient
logo site solar channel
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric Vehicles
  • Articles
    • Opinion Article
    • Manufacturer's Article
    • Technical Article
  • Latam
  • Batteries
  • Blog
  • Solar Energy Companies
    • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Consultancy
  • Courses
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric Vehicles
  • Articles
    • Opinion Article
    • Manufacturer's Article
    • Technical Article
  • Latam
  • Batteries
  • Blog
  • Solar Energy Companies
    • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Consultancy
  • Courses
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric vehicles
  • Articles
    • Opinion
    • technicians
    • Manufacturer Items
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • About Us
  • Advertise Here
  • CS Consulting
  • Courses
  • International market
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric vehicles
  • Articles
    • Opinion
    • technicians
    • Manufacturer Items
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • About Us
  • Advertise Here
  • CS Consulting
  • Courses
  • International market
logo site solar channel
Home / News / Chamber approves PL 5829 and text goes to the president for sanction

Chamber approves PL 5829 and text goes to the president for sanction

Text was unanimously approved and includes an amendment on floating panels
Follow on Whatsapp
  • Editorial Photo Canal Solar Redação Canal Solar
  • December 16, 2021, at 20:05 AM
1 min 51 sec read

Updated 10:30am

The Legal Framework for GD (Distributed Generation), a proposal presented by the rapporteur of PL 5829 (Bill no. 5829/2019), was approved in the Chamber of Deputies this Thursday (16).

The text now goes to the President of the Republic for sanction – he will have 15 working days to sanction or veto the text, partially or in full.

Read the full text of final report.

The vote, in a single round, was unanimous, according to the proposal's rapporteur, deputy Lafayette de Andrada (Republicanos/MG). “I am very satisfied with this unanimous approval”, celebrated the parliamentarian shortly after the vote.

Authored by deputy Silas Câmara (Republicans/AM), the text aims to create the Legal Framework for DG (distributed generation) in Brazil, assigning to ANEEL (National Electric Energy Agency) the responsibility to consider technical, environmental and social attributes in the calculation of energy compensation.

Amendments accepted and rejected

The proposal had been approved by the Senate on Wednesday (15), in a single round with an absolute majority of votes, but underwent changes and 14 amendments were accepted.

Returning to the Chamber, however, only amendment nº 4 (which was nº 30 in the Senate), proposed by Senator José Aníbal (PSDB), was accepted in the voted text.

This allows the classification of floating photovoltaic solar panels in reservoirs as MMGD (Microgeneration and Distributed Minigeneration), allowing the division of generating units up to the power limit.

Below is the full text of the Amendment No. 4:

“§ 3 The prohibition referred to in § 2 of this article does not apply to floating photovoltaic generation units installed on the water surface of water reservoirs, dams and lakes, natural and artificial, as long as each unit observes the maximum limit of installed microgeneration or distributed minigeneration power, has inverter equipment, transformers and autonomous meters with specific georeferenced identification, and has requested access to the concessionaire or permission holder for the distribution of electricity in the same concession area or permission that will serve the consumer unit energy beneficiary.”

Market and Regulation Course
Editorial Photo Canal Solar
Redação Canal Solar
Content signed by experts and collaborators of Canal Solar, with technical analysis, practical reflections and experiences from the solar energy sector.
PreviousPrevious
NextNext

Leave a comment Cancel reply

Your email address will not be published. Required fields are marked with *

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

News from Canal Solar in your Email

Posts

The free energy market continues to grow in Brazil, but at a more moderate pace in 2026. According to data released by CCEE, more than 4.800 consumers migrated to the free market in the first quarter of this year. Despite the significant number, the volume represents a 36,5% decrease compared to the same period in 2025. But what does this mean in practice? In the free market, consumers can choose from whom to buy energy and negotiate prices, terms, and contractual conditions. This increases competitiveness and can generate cost reductions for companies. According to CCEE, the sector is now experiencing a natural adjustment after the strong expansion recorded in 2024 and 2025, when the high-voltage segment was fully opened. Even with the slowdown, the number of new entrants remains high compared to the average observed until 2023. And you, do you believe that the free market should accelerate further in the coming years?

ANEEL must analyze the extension of the suspension of reimbursements to wind and solar energy companies due to constrained-off measures.

Business leaders are demanding a review of the criteria used to set electricity prices.

Business leaders are demanding a review of the criteria used to set electricity prices.

More news

Read More
Aerial image of a solar farm.

Solar farm: what is it and how does it work?

Solar energy charge controller

Solar charge controller: what is it and how does it work?

ABNT reopens technical work for partial update of NBR 17193

ABNT reopens technical work for partial update of NBR 17193

It is a news and information channel about the photovoltaic solar energy sector. Channel content is protected by copyright law. Partial or total reproduction of this website in any medium is prohibited.

Facebook X-twitter Instagram Youtube LinkedIn Spotify

Site Map

Categories

  • News
  • Articles
  • Interviews
  • Consumer Guide
  • Authors
  • Videos
  • Projects
  • Magazine
  • Electric Vehicles

Channels

  • About Us
  • Contact
  • Privacy
  • Quality Policy
  • Work with us
  • Expedient
  • advertise here

Membership and certifications

Copyright © 2026 Canal Solar, all rights reserved. CNPJ: 29.768.006/0001-95 Address: José Maurício Building – Mackenzie Avenue, 1835 – Floor 3, – Vila Brandina, Campinas – SP, 13092-523
Receive the latest news

Subscribe to our weekly newsletter

Fill in the information above and receive your free copy of Canal Solar magazine.