• Tuesday, December 16, 2025
Facebook X-twitter Instagram Youtube LinkedIn Spotify
  • GC Solar: 17,95 GW
  • GD Solar: 41,3 GW
  • TOPCon Modules: $0,088/W
  • P-Type Cells: $0,034/W
  • N-Type Cells: $0,032/W
  • HJT Modules: $0,10/W
  • N-Type Wafer: US$0,128/pc
  • Polysilicon: US$ 19,00/kg
  • GC Solar: 17,95 GW
  • GD Solar: 41,3 GW
  • TOPCon Modules: $0,088/W
  • P-Type Cells: $0,034/W
  • N-Type Cells: $0,032/W
  • HJT Modules: $0,10/W
  • N-Type Wafer: US$0,128/pc
  • Polysilicon: US$ 19,00/kg
  • advertise here
  • About us
  • Expedient
logo site solar channel
  • News
    • energy storage
    • Market and Prices
    • Investments & Business
    • Policy and Regulation
  • Articles
    • Batteries
    • Photovoltaic structures
    • Photovoltaic inverters
    • Opinion
  • Renewable
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Events
  • Videos
  • Electric Vehicles
  • Consultancy
  • Academics
  • News
    • energy storage
    • Market and Prices
    • Investments & Business
    • Policy and Regulation
  • Articles
    • Batteries
    • Photovoltaic structures
    • Photovoltaic inverters
    • Opinion
  • Renewable
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Events
  • Videos
  • Electric Vehicles
  • Consultancy
  • Academics
  • News
    • Brazil
    • World
    • Technology and inovation
  • Articles
    • technicians
    • Opinion
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • Events
  • Videos
  • About Us
  • Advertise Here
  • CS Consulting
  • Canal VE
  • Academics
  • News
    • Brazil
    • World
    • Technology and inovation
  • Articles
    • technicians
    • Opinion
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • Events
  • Videos
  • About Us
  • Advertise Here
  • CS Consulting
  • Canal VE
  • Academics
logo site solar channel
Home / Articles / Coach / Grounding of large photovoltaic power plants

Grounding of large photovoltaic power plants

Assessment of the performance of the grounding system of a PV plant must be carried out considering two criteria
Follow on Whatsapp
  • Photo by Paulo Edmundo Freire Paulo Edmundo Freire
  • June 14, 2021, at 12:59 AM
5 min 24 sec read
Grounding of large power generating plants
It is not possible to compare the dimensions of a substation with those of a large-scale photovoltaic plant. Photo: Freepik

In collaboration with electrical engineer Wagner Costa

The last paragraph of the document IEEE 2778-D4:2020 – Guide for Solar Power Plant Grounding for Personnel Protection, regarding the commissioning of a large photovoltaic plant (above 5 MWp), can be summarized as follows, in a very loose translation: “Make a good design of the grounding system, based on a good soil resistivity database, because it won’t be possible to measure it later.”

This is an important observation that we must bear in mind when designing the grounding system of a photovoltaic plant. Many projects are designed as if a large photovoltaic plant were a substation, based on shallow geoelectrical surveys and using software that considers the grounding grid conductors to be ideal. 

It is not possible to compare the dimensions of a substation with that of a large photovoltaic plant. The software that is used for an SE, with dimensions on the order of tens of meters, is not necessarily suitable for any type of project, much less for large generating plants, with dimensions on the order of kilometers, as is the case of parks wind and photovoltaic plants.

The IEEE-2778-D4:2020 standard suggests that soil resistivity measurements be made using a matrix of the order of 500 mx 500 m. The standard also suggests that these soundings must be spaced up to 75 m apart, which means an AB opening of the order of 220 m (considering that it is a Wenner measuring arrangement). 

Finally, the standard suggests that some large-aperture drillings of 300 meters be carried out, which means an AB opening of around one kilometer, in order to characterize the deep layers of the soil, with equipment with power compatible with such testing and field conditions. A matrix of geoelectric drillings of around 500 mx 500 m has a dimension of the order of magnitude of a photovoltaic plant sector (group of photovoltaic arrays connected to the same electrical center). 

A geoelectric survey with a 1 km aperture requires the availability of a powerful resistivity meter, which enables the injection of a measuring current that provides a good signal-to-noise ratio and the separation of the Static Potential (SP) from the measurement. IEEE-2778-D4:2020 notes that due to the large dimensions of large-scale photovoltaic plants, the impedance of the conductors from one end of the grid to the other can be of the order of magnitude of their own grounding resistance, highlighting the importance of more accurate modeling of the grounding system. 

Regarding programs for simulating grounding systems, this standard notes that several programs have limitations regarding soil modeling, the maximum number of conductor segments, or the failure to consider the conductors' own and mutual impedances. This standard, which is the most comprehensive regarding the grounding system of large-scale photovoltaic plants, makes clear the need for deep soil models and appropriate software, not only for photovoltaic plant projects, but also for wind farms.

According to the IEC/TS 62738:2018 standard – Ground-mounted photovoltaic power plants – Design guidelines and recommendations, a photovoltaic plant is an energy generation plant, access to which is restricted to qualified people and with PPE (personal protective equipment). ) adequate.

According to standard IEEE-2778-D4:2020 (item 5.3.5), the internal area of ​​a photovoltaic plant can be considered a controlled environment, where the use of shoes with insulating soles suitable for a power generation plant may be required. energy.

Based on these premises, the evaluation of the performance of the grounding system of a photovoltaic plant, from the point of view of human safety, must be carried out considering two criteria, one valid for workers inside the photovoltaic plant and the other for anyone who touches the fence. on the external perimeter of the photovoltaic plant.

According to ABNT 16.603:2017 – Electrical Insulating Footwear, the electrical resistance of an electrician's boot must be greater than 1.000 MΩ. The footwear must be able to withstand the application of 14.000 V (rms) at 60 Hz for one minute, and the leakage current value must not be greater than 0,5 mA. Therefore, the issue of human safety inside the photovoltaic plant is not critical, considering that everyone inside is qualified and uses appropriate PPE.

Therefore, the critical region for the purpose of designing the grounding grid is the outer perimeter of the fence, where any barefoot citizen could touch it. Ideally, the fence should be grounded independently of the grid of the photovoltaic plant, which is not always possible. The figure below illustrates the mapping of the GPR (Ground Potential Rise) in the simulation of a DG photovoltaic plant (5 MWp) with two types of software:

  • Above: real conductor mesh;
  • Below: mesh of ideal conductors (zero impedance – equipotential mesh).

The difference in the GPR calculated for the two conditions is significant (between 30% and 50%), even for a photovoltaic plant of only 5 MW. For a large photovoltaic plant, the error imposed by a program that considers the equipotential mesh will be much greater, resulting in the mapping of step and touch voltages that are quite different from those that can actually occur. 

The worst thing is that the simulation with a program that considers the equipotential mesh presents an optimistic result, not allowing the identification of high potential gradients that occur in the part of the photovoltaic plant close to the substation, and that result in voltages and touch that can exceed the tolerable limits, especially on the external perimeter of the photovoltaic plant fence.

Therefore, the evaluation of the performance of the grounding system of a large generating plant, whether a photovoltaic plant or a wind farm, considering the requirements established in the applicable international standards (IEEE and IEC), requires a whole set of of modeling resources that go far beyond the resources usually applicable to substations and other smaller installations.

Grounding and SPDA Course
Photo by Paulo Edmundo Freire
Paulo Edmundo Freire
Graduated in Electrical Engineering and Master in Power Systems, both from the Pontifical Catholic University of Rio de Janeiro. PhD in Geosciences from Unicamp. He carries out research in the area of ​​grounding systems, applying Electrical Engineering and Geosciences.
PreviousPrevious
NextNext

Answers of 3

  1. Luiz Sergio Faria said:
    23 June 2021 to 19: 59

    Hello, good evening, everyone, I come from the area, from assembly of trays to strength electrician and contract with cable laying to substation assembly. We did the grounding according to the projects in each area. Today I am retired, I am in the Renewable energy area and I don't see any problems to carry out On-grid and Off-grid installations always with the same respect for electrical magnitudes. I am still looking for our space by forming teams to enter the properties of residential and industrial clients. I see many fields of work ahead. Improve with this great Master Paulo Freire who will help us a lot in our work.

    Reply
  2. Antônio Cesar Baleeiro Alves said:
    18 June 2021 to 11: 05

    Excellent article. Highlights key points about UFV grounding. Regarding the appropriate instrumentation, it would be a topic of great interest to be addressed in my opinion.

    Reply
  3. Hector said:
    17 June 2021 to 15: 38

    I am interested in taking a quick and transparent course for small projects, I want to do domestic installations, like an action between friends in the small town where I live.
    I have an average level.

    Reply

Leave a comment Cancel reply

Your email address will not be published. Required fields are marked with *

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

News from Canal Solar in your Email

Posts

DPS: expense or investment?

Wind loads on photovoltaic structures

More news

Read More
European Union decides to end imports of Russian gas by 2028
  • December 5, 2025
Photo by Raphael Guerra
Raphael Guerra

European Union decides to end imports of Russian gas by 2028

  • November 7, 2025
Photo by Wagner Freire
Wagner Freire

Hydrogen sector calls for veto of rule on self-production of energy.

  • October 28, 2025
Photo by Thiago Farias
Thiago Farias

Financial feasibility study of BESS vs Diesel

It is a news and information channel about the photovoltaic solar energy sector. Channel content is protected by copyright law. Partial or total reproduction of this website in any medium is prohibited.

Facebook X-twitter Instagram Youtube LinkedIn Spotify

Site Map

Categories

  • News
  • Articles
  • Interviews
  • Consumer Guide
  • Authors
  • Projects
  • Brazil
  • World
  • Technical Articles
  • Opinion Articles
  • Manufacturer Items
  • Electrical Sector
  • Biddings
  • Products

Channels

  • About Us
  • Contact
  • We’re hiring!
  • Privacy
  • Expedient
  • advertise here

Membership and certifications

Copyright © 2025 Canal Solar, all rights reserved. CNPJ: 29.768.006/0001-95 Address: José Maurício Building – Mackenzie Avenue, 1835 – Floor 3, – Vila Brandina, Campinas – SP, 13092-523

We use cookies to make your experience on this site better Find out more about the cookies we use or turn them off in your .

Receive the latest news

Subscribe to our weekly newsletter

Canal Solar
Powered by  GDPR Cookie Compliance
Privacy

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Cookies strictly required

Strictly Necessary Cookie should be at all times so that we can save your preferences for cookie settings.

Cookies for third parties

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.