National ranking indicates broad access and contrasts in cost and quality of electricity. 12 January 2026
Heat waves increase energy consumption, and the National System Operator (ONS) warns about reservoir levels in the South. 12 January 2026
Thermal power plants support the National Interconnected System (SIN), but exacerbate the dilemma of the energy transition. 2 January 2026
ONS projects an increase in load demand in the SIN and in two subsystems until the end of January. December 31, 2025
La Niña marks the start of summer with irregular rainfall and impacts on the electricity sector. December 19, 2025
Amper signs R$ 842 million contract with Equatorial to expand electricity grid in Pará. December 19, 2025
Conte Group reaches 3 plants and 250 MW, reinforcing its vertical integration strategy. December 2, 2025
Energy consumption is expected to grow across the country until the end of 2025, says ONS. December 1, 2025
Energy load in the SIN (National Interconnected System) falls 1,5% in September, says ONS (National System Operator). November 14th, 2025
ONS projects water storage levels 25% below 2025 levels in an unfavorable scenario. November 12th, 2025