ADVERTISING
Solar Energy News
Certification at levels N1 and N2 proves the full compliance of Huawei solutions with the dynamic criteria of the SIN (Brazilian Interconnected System).
ABIHV opposes the energy additionality criterion foreseen in the electricity sector reform.
The BESS project will be operated using a load-shifting model, with the potential to reduce
Italian company develops wind turbine that could be a solution for homes and buildings.
Top Articles on Solar Energy

The energy war and the future of distributed generation in Brazil.
November 7th, 2025


Brewery in Portugal to have a 100 MWh mega thermal battery.
November 5th, 2025