A ANEEL (National Electric Energy Agency) decided, this Tuesday (4), the maintenance of the fine of R$ 28.3 million for the Light distributor. O resource he was denied during a collegiate meeting.
Light was punished in day March 5th this year due to the delay in power restoration electricity in interruptions in the period between October 2022 It is September 2023 in the distributor's concession area.
During the period analyzed, inspection detected recovery time more than 24 hours in 39,930 interruptions, which harmed 77,651 consumers.
According to the analysis, there was a significant worsening compared to 2020 when 16,689 outages were restored over 24 hours, affecting 42,389 consumers
All content on Canal Solar is protected by copyright law, and partial or total reproduction of this site in any medium is expressly prohibited. If you are interested in collaborating or reusing some of our material, we ask that you contact us via email: [email protected].
One Response
Power to electrical energy, with this we must consider better conditions for the consumption of the work carried out.