• Friday, June 26, 2026
Facebook X-twitter Instagram Youtube LinkedIn Spotify
  • GC Solar: 22,33 GW
  • GD Solar: 48,33 GW
  • advertise here
  • About Us
  • Expedient
logo site solar channel
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric Vehicles
  • Articles
    • Opinion Article
    • Manufacturer's Article
    • Technical Article
  • Latam
  • Batteries
  • Blog
  • Solar Energy Companies
    • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Firmare
  • Courses
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric Vehicles
  • Articles
    • Opinion Article
    • Manufacturer's Article
    • Technical Article
  • Latam
  • Batteries
  • Blog
  • Solar Energy Companies
    • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Firmare
  • Courses
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric vehicles
  • Articles
    • Opinion
    • technicians
    • Manufacturer Items
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • About Us
  • Advertise Here
  • CS Consulting
  • Courses
  • International market
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric vehicles
  • Articles
    • Opinion
    • technicians
    • Manufacturer Items
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • About Us
  • Advertise Here
  • CS Consulting
  • Courses
  • International market
logo site solar channel
Home / News / Applied correctly, NBR 5410 prevents fatal accidents

Applied correctly, NBR 5410 prevents fatal accidents

Paulo Freire explains how the rule would prevent the death of a Campinas resident who was electrocuted after touching a pole
Follow on Whatsapp
  • Editorial Photo Canal Solar Redação Canal Solar
  • February 25, 2021, at 13:00 PM
1 min 58 sec read

Last Sunday (21), a 52-year-old man died after being electrocuted in Lagoa do Taquaral, in Campinas, in the interior of São Paulo.

Eduardo Girotto was playing tennis when he touched one of the lamp posts between the Lagoa courts. Despite the activation of SAMU (Mobile Emergency Care Service) and the Fire Department, the man had a cardiac arrest and died instantly. 

The site has been isolated and is undergoing forensic examination by the scientific police and inspection by the Public Services department. The city council stated that it will take all necessary measures and provide full support to investigations.

Second Simone Girotto, your husband he received the electric shock when he leaned on the pole to pick up a tennis ball. 

“He leaned on the pole to get the tennis ball and stayed there, he couldn't take his hand off the pole because of the electrical discharge. They tried to take him out and also got shocked, they ran to the administration to ask to turn off the power while he was receiving the electric shock”, reports the widow.

Electrical engineer Paulo Freire states that if the circuit that powers the pole had three resources provided for by the NBR-5410 standard – grounding of the pole, ground conductor connected to the pole structure and DR (Differential-Residual) device – this fatality would probably not have occurred. 

“The grounding combined with the earth conductor would provide adequate value and a return path for the current back to earth, which would result in the circuit breaker actuating, turning off the circuit and de-energizing the pole”, explains the engineer. 

According to Freire, the accident occurred due to installation and maintenance failures of the public lighting network, with probable non-compliance with the applicable ABNT standards and the lack of a DR device.

“It could be that the contact between the wire and the pole was poor, characterizing what is called a high impedance fault, which would not result in sufficient short-circuit current to guarantee the circuit breaker’s operation. In this case, the DR device would detect the current leakage to earth and disconnect the circuit, the light post must be protected by a DR device”, adds Freire.

Grounding and SPDA Course Porto Seguro
Editorial Photo Canal Solar
Redação Canal Solar
Content signed by experts and collaborators of Canal Solar, with technical analysis, practical reflections and experiences from the solar energy sector.
PreviousPrevious
NextNext

An answer

  1. Luanna Geraldi said:
    25 February 2021 to 13: 13

    Congratulations to the writer!!!!

    Reply

Leave a comment Cancel reply

Your email address will not be published. Required fields are marked with *

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

News from Canal Solar in your Email

Posts

Canal Solar - Batteries can increase distributed generation credits by more than 60%, according to TR Soluções.

Batteries can increase distributed generation (DG) credits by more than 60%, according to TR Soluções.

A new storage solution using sodium batteries will arrive on the Chinese market in September.

A new storage solution using sodium batteries will arrive on the Chinese market in September.

More news

Read More
Canal Solar - Safety in photovoltaic installations what are the main mistakes made

Safety in photovoltaic installations: what are the main mistakes made?

Canal Solar - Deciphering the tracker system

Deciphering the tracker system

USP holds seminar on smart mini-grids applied to interconnected isolated systems

USP holds seminar on smart mini-grids applied to interconnected isolated systems

It is a news and information channel about the photovoltaic solar energy sector. Channel content is protected by copyright law. Partial or total reproduction of this website in any medium is prohibited.

Facebook X-twitter Instagram Youtube LinkedIn Spotify

Site Map

Categories

  • News
  • Articles
  • Interviews
  • Consumer Guide
  • Authors
  • Videos
  • Projects
  • Magazine
  • Electric Vehicles

Channels

  • About Us
  • Contact
  • Privacy
  • Quality Policy
  • Work with us
  • Expedient
  • advertise here

Membership and certifications

Copyright © 2026 Canal Solar, all rights reserved. CNPJ: 29.768.006/0001-95 Address: José Maurício Building – Mackenzie Avenue, 1835 – Floor 3, – Vila Brandina, Campinas – SP, 13092-523
Receive the latest news

Subscribe to our weekly newsletter

Fill in the information above and receive your free copy of Canal Solar magazine.