It was disclosed on the last Friday (05) o bulletin do PMO (Monthly Operation Program), referent à semana operational between days 6 a 12 de April. Second o ONS (National Electrical System Operator), the scenario is de elevation for ENA (Affluent Natural Energy) to the final do month, and on comparison to Olos technology first projection to April.
According to the Operator, the South region presents the most significant percentage with 127% of the MLT (Long Term Average), compared to 67% of the MLT presented in the last edition.
ENA also has prospects for advancement in the Southeast/Central-West, with 84%; in the Northeast, with 66% of MLT; and for the North, the estimate is 87% of the MLT.
“Despite the most positive indications, the outlook is below the historical average for the period in three subsystems,” stated the ONS.
The EAR (Stored Energy) estimates for the end of April are higher than those released in the initial review for the month, with all subsystems expected to exceed 65%.
The North region highlights a higher percentage, with 96,9%; for the Northeast region the estimate is 77,8%; for the Southeast/Central-West, with 75%; and the South, with 69,1%.
“As mentioned in recent weeks, the ONS has been proposing measures to maintain favorable reservoir conditions, an important factor in ensuring load and power demands are met throughout the year,” stated the Operator.
Projections continue to indicate growth in load demand both in the SIN (National Interconnected System) and in all subsystems.
Growth in SIN is expected to reach 8,1% (80.013 MW). Among the subsystems, the greatest acceleration is expected in the Northeast, with 10,3% (13.455 MW); followed by the South, with 10% (13.862MW); Southeast/Central-West, with 7,1% (45.182 MW), and for the North it is 6,7% (7.514 MW).
“The numbers are comparisons between the estimates for April 2024 and those seen in the same period in 2023,” stated the ONS.
The CMO (Marginal Operating Cost) is R$7,90 in the Southeast/Central-West and South. For the Northeast and North regions, the CMO is R$7,77.
all the content of Canal Solar is protected by copyright law, and partial or total reproduction of this site in any medium is expressly prohibited. If you are interested in collaborating or reusing part of our material, please contact us by email: redacao@canalsolar.com.br.