• Tuesday, April 28, 2026
Facebook X-twitter Instagram Youtube LinkedIn Spotify
  • GC Solar: 22,32 GW
  • GD Solar: 47,45 GW
  • advertise here
  • About us
  • Expedient
logo site solar channel
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric Vehicles
  • Articles
    • Opinion Article
    • Manufacturer's Article
    • Technical Article
  • Latam
  • Batteries
  • Blog
  • Solar Energy Companies
    • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Consultancy
  • Courses
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric Vehicles
  • Articles
    • Opinion Article
    • Manufacturer's Article
    • Technical Article
  • Latam
  • Batteries
  • Blog
  • Solar Energy Companies
    • Integrators
  • Magazine
    • Magazine Canal Solar
    • Conecta Magazine
  • Consultancy
  • Courses
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric vehicles
  • Articles
    • Opinion
    • technicians
    • Manufacturer Items
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • About Us
  • Advertise Here
  • CS Consulting
  • Courses
  • International market
  • News
    • Market & Investments
    • International market
    • Politics & Regulation
    • Projects & Applications
    • Renewable
    • Sustainability & ESG
    • Technology & Innovation
    • Electric vehicles
  • Articles
    • Opinion
    • technicians
    • Manufacturer Items
  • Latam
  • Blog
  • Solar Energy Companies
  • Integrators
  • Magazine
    • Conecta Magazine
  • About Us
  • Advertise Here
  • CS Consulting
  • Courses
  • International market
logo site solar channel
Home / Articles / Technical Article / How to apply NBR 16690 in a voltage drop study in a DC circuit?

How to apply NBR 16690 in a voltage drop study in a DC circuit?

Understand, based on a real example, how NBR 16690 deals with voltage drops in direct current circuits in photovoltaic systems
Follow on Whatsapp
  • Photo by Marcelo Villalva Marcelo Villalva
  • July 25, 2020, at 14:33 am
9 min 22 sec read
How to apply NBR 16690 in a voltage drop study in a DC circuit?
Photo: Disclosure

Updated October 14, 2025

The design of the photovoltaic system must consider several technical aspects such as the gauge and length of the cable, the voltage drop in the circuit and the difficulties that may be encountered in carrying out the physical work.

In this article, we will address the voltage drop in the direct current circuit by exploring a real case. During the project, there was a doubt about the best way to arrange the inverters. Should they be positioned close to the photovoltaic modules or next to the property's power supply point?

A loss analysis indicates that the best solution would be to position the inverters close to the property's entry point. This minimizes generation losses, as it shortens the alternating current cabling and causes greater distances to be covered by the direct current circuit, in which the voltage is higher and the current is reduced.

The photovoltaic system was installed on a rural property where there is a considerable distance from the construction area to the power supply point. It was preferred not to connect the photovoltaic system to the building's internal circuit, as it was an old installation.

The connection of photovoltaic systems to existing distribution boards, especially in old or poorly sized installations, often causes problems with voltage variations and unwanted shutdown of the inverters.

Figure 1: Status of the photovoltaic system and route to be taken to connect to the electricity grid
Figure 1 – Status of the photovoltaic system and path to be taken for connection to the electrical grid
Figure 2: Arrangement of the strings on the building roof
Figure 2 – Arrangement of strings on the roof of the building

In Figure 2 we observe the positioning of the strings over the roof. An inverter with 12 MPPT inputs was used. The longest circuit, called MPPT1, has a total length (considering the positive and negative cables) of 920 meters. It is on this circuit that we will perform our voltage drop analysis. The distances from each string to the inverter are shown in Table 1, below.

Table 1 – Distances from strings to the inverter

What does NBR 16690 say about voltage drop?

A known problem in the area of ​​electrical installation design is the voltage drop in cables. Two criteria are used when sizing a cable or electrical conductor: current carrying capacity and voltage drop.

In long circuits, even if the conductor gauge meets the current conduction criterion, the voltage drop criterion will not always be satisfied. In this case, the solution to be adopted is to use a larger gauge cable, which increases the cost and complexity of the installation.

A photovoltaic project is, above all, an electrical installation project. Low voltage installations in general are governed by the NBR 5410 standard and photovoltaic installations are governed by the NBR 16690 standard.

The two complement each other, and the NBR 16690 standard concerns more specifically direct current circuits, whose specificities were not addressed in the first standard mentioned. The percentage voltage drop in a direct current circuit is calculated as:

Drop (%) = Delta_V / U

Delta_V = R x I

R = r * C

Delta_V is the voltage drop in the circuit (V), U is the source voltage (V), R is the conductor resistance (ohms), I is the intensity of the electric current (A), C is the total length of the circuit (m) er is the resistance per unit length (ohms/m) of the cable found in the manufacturer's catalogue.

Figure 3: Direct current circuit composed of a source, a receiver and electrical conductors
Figure 3 – Direct current circuit composed of a source, a receiver and electrical conductors

The NBR 16690 standard says the following:

The standard recommends, but does not require, that the voltage drop in the DC circuit be no more than 3%. Whenever possible, the guidance in the standard should be followed. If the guidance is not followed, the designer must rely on his experience and other technical factors to make the best decision.

What would be the problem with a high voltage drop in the DC circuit? The answer is just one: loss of generation. Voltage drops cause energy losses that accompany the photovoltaic system throughout its useful life. However, losses will always exist and can only be minimized by expanding the cable gauges, which consequently costs and complicates installations.

Case study: photovoltaic system on rural property

Two gauge options were possible: 6 mm2 or 10 mm2. With the 6 mm2 gauge, connections would be easier, since the inputs of the inverter used in the project have receptacles for connectors up to 6 mm2, as shown in the illustration in Figure 4.

In Figure 4 we see that the inverter has 6 MPPTs and 12 inputs for connecting circuits, two inputs per MPPT. In this project each string box was connected to one of the 12 inputs. You MC4 connectors are standardized in two versions: gauges of 1,5 and 2,5 mm2, 4 and 6 mm2 and 10 mm2, as can be seen in Table 2 below.

Using 10 mm2 cables would make it impossible to use MC4 connectors to directly connect the strings to the inverter, necessitating the construction of external string boxes. In addition to the additional cost of adding string boxes, using 10 mm2 cable would make it difficult to run the cables through the DC circuit duct.

The challenge of this case study, therefore, was to prove the feasibility of adopting the 6 mm2 cable in this project that has long circuit lengths – one of the strings requires almost 1 kilometer of cables.

Figure 4: Illustration of the connector area for the direct current circuits of the MAX 75KTL3 LV inverter
Figure 4: Illustration of the connector area for the direct current circuits of the MAX 75KTL3 LV inverter

Table 2 – Standard MC4 connector sizes

Source: Staübli/Multicontact
Source: Staübli/Multicontact

Voltage drop calculation

Below we find the table with the characteristics of the cables used in the project (Cortox Solar/Cordeiro Cabos Elétricos).

Table 3 – Technical characteristics of Cortox Solar/Cordeiro Electric Cables

In accordance with NBR 16690 guidance, voltage drop is calculated with reference to the voltage at the point of maximum power in STC (standard test conditions: 1000 W/m2 and 25 oW). The information we need to extract from the table is the resistance of the conductor. We find in the table: r = 3,39 ohms/km for the 6 mm cable2 er = 1,95 ohms/km for 10 mm cable2.

In this project, with 20 modules in series, with a maximum individual power voltage of 40,3 V in STC, a total voltage of 806 V is reached. The allowable voltage drop would therefore be: 3% x 806 = 24,18 V . At maximum load condition the current of each string is I = 11 A.

This number was found by dividing the total current (132 A, as shown in Figure 5) by the number of strings, which is 12. The maximum load condition was obtained from the system sizing in PVSyst.

Considering a typical operating temperature of 70 oC, the system reaches a maximum power of 87,3 kW (which also corresponds to the maximum input power of the inverter). This is an example of good compatibility between the characteristics of strings and the inverter. The occurrence of clipping will be very small in this project.

From the point of view of calculating the voltage drop, the consideration made is correct, as it represents the maximum generation power that can be achieved with this system. At lower temperatures, the system's IV curve (green trace) will be shifted to the right, causing the power to be limited to the maximum value that the inverter can support (represented by the dashed line). If the temperature is greater than 70 oC, the maximum load condition will have power lower than the value considered.

Figure 5: System sizing in PVSyst
Figure 5 – System sizing in PVSyst

With all the data in hand we can proceed to calculate the voltage drop for the 6 mm cable2:

r = 3,39 ohms/km ; C = 0,92km; I = 11A; U = 806V

R = r * C = 3,1188 ohms

Delta_V = R * I = 34,3 V

Drop (%) = 34,3 / 806 = 4,25%

The calculation reveals that, according to the normative guidance, the limit of 3% of the maximum power voltage in STC is violated. However, some considerations about this are necessary.

Firstly, the voltage drop limit in NBR 16690 is a recommendation. Voltage drop greater than 3% is not a prohibition, as it does not pose any safety or risk of any kind to the system. It should only be borne in mind that the presence of excessively high voltage drops would result in generation losses.

In this case, however, the calculated voltage drop is very close to the recommended limit and occurs in only one of the 12 strings. In cases like this, the designer must evaluate the convenience of respecting the 3% limit or choosing a higher gauge cable.

In this project, the option of increasing the gauge to 10 mm2 This would cause difficulties in laying the cables and reduce the safety of the system by increasing the complexity and number of components and electrical connections. There would also be an increase in cost, which would not justify the benefit of reducing generation loss – a negligible benefit, in this case, as verified in a simulation carried out at PVSyst.

Conclusion

The maximum recommended voltage drop in photovoltaic systems is 3% for direct current circuits. This drop is calculated based on the maximum power voltage of the photovoltaic module string at 25°C and 1000 W/m2 (STC conditions).

Voltage drops greater than 3% are permissible, as long as they do not significantly impact the performance of the photovoltaic system. This impact must be measured and evaluated through simulations in PVSyst. Aspects such as cost, complexity and safety must be analyzed together with the other design criteria for an installation.

In the case analyzed, it was found that the best option would be to use a smaller gauge cable instead of a larger one. In the circuit analyzed, corresponding to one of the system's 12 strings, the benefit of the larger gauge would be minimal, not justifying the inconvenience of adopting it.

To understand more about cable sizing criteria in photovoltaic systems and other design considerations, be sure to check out the solar energy courses Canal Solar!


With the collaboration of Elvis Almeida and Guilherme Sanches, from MySol Energia Solar; and Micaella Aynoã

ABNT NBR 16.690 PVSyst photovoltaic system
Photo by Marcelo Villalva
Marcelo Villalva
Specialist in photovoltaic systems. Professor and researcher at the Faculty of Electrical and Computer Engineering (FEEC) at UNICAMP. Coordinator of LESF - Energy and Photovoltaic Systems Laboratory at UNICAMP. Author of the book "Photovoltaic Solar Energy - Concepts and Applications".
PreviousPrevious
NextNext

Answers of 5

  1. Renan said:
    18 from 2023 from September to 11: 28

    Figure 3 shows the length of a pole as C/2, however, the total length of both poles is used in the calculations. What should be considered, the length of the strings (C/2) or the sum of the two poles (C)?

    Reply
  2. Alisson Camillo said:
    18 from 2023 to 08 at 34: XNUMX

    Excellent case study, congratulations on the article! Cleared my doubts!

    Reply
  3. DANIEL GONCALVES FAGUNDES said:
    4 May 2022 to 15: 44

    It is the module current

    Reply
  4. Adriano Almeida said:
    10 April 2021 17 gies: 59

    Cool, Marcelo,
    I just didn't quite understand the current (i) of 11 A. How did you find it?

    Reply
    1. João said:
      9 from 2023 to 22 at 33: XNUMX

      The calculation of 11A was previously done by calculating the number of plates used per string, that is, taking the Datasheet of the plate used, extracting the current value of the plate individually and multiplying it by the number of plates used in each string.

      Reply

Leave a comment Cancel reply

Your email address will not be published. Required fields are marked with *

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

News from Canal Solar in your Email

Posts

Understand in practice how to size hybrid battery-powered systems.

Understand in practice how to size hybrid battery-powered systems.

ESG in Brazilian Solar Photovoltaic Energy: Governance, Regulation, and Project Engineering

ESG in Brazilian solar photovoltaic energy: governance, regulation and project engineering.

More news

Read More
Canal Solar - Solar accounts for 75% of new additions and leads renewable energy growth in 2025.

Solar accounts for 75% of new additions and leads the growth of renewables in 2025.

Does a consumer who has opted into the B tariff have an acquired right to send and receive surplus energy and credits?

Does a B-optante consumer have an acquired right to send and receive surplus energy and credits?

Canadian Solar inverters enable zero-grid generation at school with saturated grid.

Canadian Solar inverters enable zero-grid generation at school with saturated grid.

It is a news and information channel about the photovoltaic solar energy sector. Channel content is protected by copyright law. Partial or total reproduction of this website in any medium is prohibited.

Facebook X-twitter Instagram Youtube LinkedIn Spotify

Site Map

Categories

  • News
  • Articles
  • Interviews
  • Consumer Guide
  • Authors
  • Videos
  • Projects
  • Magazine
  • Electric Vehicles

Channels

  • About Us
  • Contact
  • Privacy
  • Quality Policy
  • Work with us
  • Expedient
  • advertise here

Membership and certifications

Copyright © 2026 Canal Solar, all rights reserved. CNPJ: 29.768.006/0001-95 Address: José Maurício Building – Mackenzie Avenue, 1835 – Floor 3, – Vila Brandina, Campinas – SP, 13092-523
Receive the latest news

Subscribe to our weekly newsletter

Fill in the information above and receive your free copy of Canal Solar magazine.