Agents in the electricity sector will have a direct role in the development and evaluation of a new computational platform that could replace the models currently used in planning, scheduling operations, and setting energy prices.
The ONS (National System Operator), CCEE (Chamber of Electric Energy Commercialization) and EPE (Energy Research Company) launched a joint portal to centralize information about the project and open space for technical collaboration in the market.
The initiative aims to bring transparency to the process of building the New Computational Model for the Brazilian Electricity Sector. Developed using open-source code, the tool will allow companies and other participants to conduct their own tests, evaluate the results, submit contributions, and propose improvements.
The proposal aims to expand information sharing and create conditions for the model to be submitted for validation with the participation of different segments of the sector.
More flexible tools
The review of computing infrastructure is driven by transformations in the electrical system. Among the factors cited by institutions are the growing participation of renewable sources with variable generation and the need to make the evolution of instruments used in the sector's activities more agile.
ONS, CCEE, and EPE jointly assume the development, validation, and governance of the solution, bringing together complementary responsibilities. While the operator focuses on experience related to system operation, CCEE contributes the perspective of the energy market, and EPE contributes the dimension of energy planning.
The portal was designed to reduce information asymmetries and facilitate the monitoring of project stages. Open-source development also aims to allow stakeholders to understand how the tool works and participate in discussions about its performance, rather than only having access to the final result of a process conducted by institutions.
Testing and regulatory approval
The availability of the platform does not, however, mean that the current models will be replaced immediately, since, before official adoption, the new solution must go through evaluation and approval stages foreseen in the current regulations, applicable to improvements in planning processes, operation scheduling and pricing.
The preliminary timeline foresees the development and implementation of the new model throughout the 2026/2027 cycle. The goal is for it to be officially usable in energy pricing starting in January 2028.
Until then, periodic meetings are planned with the agents to share the progress of the work, the results obtained in each evaluation phase, and the technical discussions.
The schedule also includes, contingent upon successful validation, the approval process necessary for the new tool to replace the DECOMP and NEWAVE models.
Market share
The collaboration of the agents is considered an important step to verify the functioning of the model under different conditions and to identify any potential needs for improvement.
In addition to observing the activities, participants will be able to conduct their own simulations and present technical observations to the three responsible institutions.
The process aims to combine shared governance with external input, so that the tool evolves based on broader assessments before its official use.
all the content of Canal Solar is protected by copyright law, and partial or total reproduction of this site in any medium is expressly prohibited. If you are interested in collaborating or reusing part of our material, please contact us by email: redacao@canalsolar.com.br.
Comments
Comments are moderated before publication.Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.