GC Solar 23.61 GW GD Solar 53.65 GW
News

Auction for Isolated Systems is scheduled for March 2021, says MME

The MME (Ministry of Mines and Energy) published in the DOU (Official Gazette of the Union) this Thursday (17) the Ordinance No. 341 which establishes the guidelines for holding the “Auction for Supply to Isolated Systems”, scheduled for March 2021.

The event aims to promote the contracting of supply solutions to serve 22 locations not connected to the SIN (National Interconnected System), located in the states of Acre (3), Amazonas (5), Pará (10), Rondônia (2) and Roraima (2).

According to the MME, for locations expected to be interconnected to the SIN, contractual deadlines were defined to guarantee supply until interconnection is effective. For locations with no provision for interconnection, the contractual deadlines are different depending on the primary sources used. 

For supply solutions whose primary sources are natural gas or renewables, including or not storage technologies, the contracting period will be 15 years. In other cases, the contractual term will be five years.

In order to support those interested in participating in the event, EPE (Energy Research Company) will publish instructions for registering supply solutions, as well as the requirements for issuing technical authorization.

In addition, detailed information about each location will be disclosed, obtained from the annual planning cycles for the service provided to isolated systems. Interested entrepreneurs must register their supply solutions with EPE by noon on December 12, 4.

For the purposes of registration and technical qualification, the presentation of environmental licenses will be waived, which must be presented by the winners within a deadline to be defined in the notice. The expectation is that the auction will be operated by the CCEE (Electric Energy Trading Chamber) online.

Mateus Badra
About the Author
Mateus Badra

Journalist graduated from PUC-Campinas. He worked as a producer, reporter and presenter on TV Bandeirantes and Metro Jornal. He has been following the Brazilian electricity sector since 2020.

Comments

Comments are moderated before publication.

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

Leave your comment

Canal Solar
Privacy

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.