TBEA Energy Brazil has obtained accreditation from BNDES (Brazilian Development Bank) as a supplier of battery energy storage systems (BESS) in Brazil.
In the financial institution's CFI (Computerized Supplier Accreditation) catalog, the company had a piece of equipment registered under code 04400198, with a nominal power of 6,25 MW and a storage capacity of 25 MWh.
This development occurs in the final stages of preparing the market for the first LRCAP (Capacity Reserve Auction) dedicated to contracting batteries in the country, scheduled for December 2nd and 4th, 2026.
Registering with the bank is a strategic step to enable access to BNDES financing lines for developers and investors who intend to use the brand's equipment in their projects.
Technical specifications of the system
According to the technical specifications available in the BNDES catalog, the solution registered by TBEA uses LFP (lithium iron phosphate) chemistry batteries and integrates PCS (Power Conversion System) converters and an energy management platform.
The system has an autonomy of four continuous hours operating at maximum power, with a minimum overall efficiency of 85% and a discharge depth of 100%.
The documentation also indicates a lifespan exceeding seven thousand cycles, with the possibility of operating for up to two cycles per day and a full recharge time of up to six hours.
Among the equipment's operational features is grid-forming technology, which allows the system to act as a VSG (Virtual Synchronous Generator), providing synthetic inertia and millisecond response to contribute to the voltage and frequency stability of the electrical grid.
The solution also includes independent control of active and reactive power, support for voltage dips and swells, and fast frequency response.
LRCAP 2026 and nationalization rules
The LRCAP 2026 was divided by the federal government into two separate tenders with the aim of increasing the operational flexibility and security of the SIN (National Interconnected System).
The first battery auction, scheduled for December 2nd, will be exclusively for projects using storage systems that meet nationalization requirements. The second auction, scheduled for December 4th, will be open to projects with battery systems that do not have a specific national content requirement.
The process conducted by BNDES involves the analysis of suppliers and the products presented. In the case of auctions with national content, the storage systems must meet specific nationalization criteria, according to the rules established by the institution.
Accreditation is a crucial step for manufacturers interested in supplying equipment to projects competing in the bidding process, especially in the modality that establishes nationalization requirements.
all the content of Canal Solar is protected by copyright law, and partial or total reproduction of this site in any medium is expressly prohibited. If you are interested in collaborating or reusing part of our material, please contact us by email: redacao@canalsolar.com.br.
Comments
Comments are moderated before publication.Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.