GC Solar 23.61 GW GD Solar 53.65 GW
News

BMW will expand solar energy project at the Manaus (AM) factory

Generation capacity will be sufficient to supply 30% of the annual consumption of the company's manufacturing unit

BMW will expand solar energy project at the Manaus (AM) factory

BMW's solar plant, in Manaus (AM), will be expanded from 2024. Photo: Reproduction/BMW Group

A BMW will expand the use of solar energy in your motorcycle factoryOn Manaus (AM)From 2024. The automaker reported that it will install a solar panel cover with an area of ​​approximately 1.200 m². 

According to the technical specifications of the project, the supply will be approximately 30% of the current energy demand of the manufacturing unit – which is equivalent to the manufacture of around 5 thousand motorcycles, considering the annual production capacity of 17 thousand units.

A company started investing in solar energy, in Manaus (AM), with a small photovoltaic panel project installed no factory parking lot and, after the results, he opted to expand the project.

“We started with a small attempt, 15 modules installed in the parking lot, and now we will take a bigger step with this project. Just to give you an idea, the expectation is that, in 25 years, more than 2 thousand tons of CO2 will stop being emitted into the atmosphere”, said Alex Donatti, director of the BMW factory in Manaus.

According to the executive, the Expansion of the plant is in line with the automaker’s objectives: reduce CO2 emissions per vehicle by 80% in production, 50% in use and 20% in suppliers, when compared to the company's rates in 2019. 

Actions already developed

In addition to using solar energy, the BMW factory, in Manaus (AM), also conducts recycling actions, without waste being sent to landfills. 

The furniture in the rest area, for example, is produced from wooden pallets from the industrial process.

The unit also operates under low water and energy consumption policies, through periodic monitoring and controlled by goals (KPIs), and low emission and containment of pollutants.

The opening of building 3 of the factory, in 2023, for example, represented, in addition to logistical gains for the company, a projected drop of around 35% in CO² emissions in the distribution of motorcycles.

How to have a multinational as a client of your company?

Henrique Hein
About the Author
Henrique Hein

He worked at Correio Popular and Rádio Trianon. He has experience in podcast production, radio programs, interviews and reporting. Has been following the solar sector since 2020.

Comments

Comments are moderated before publication.

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

Leave your comment

Canal Solar
Privacy

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.