GC Solar 23.61 GW GD Solar 53.65 GW
News

Next auction of transmission lines will bring greater integration to SIN

MME highlighted that electrical energy transmission will grow 20% in the next 10 years

Next auction of transmission lines will bring greater integration to SIN

Photo: Envato

This Monday (22), Guilherme Zanetti, director of DPOTI (Department of Planning and Grants for Transmission and Distribution of Electric Energy and International Interconnections) of MME (Ministry of Mines and Energy), spoke about the works planned in the first transmission auction of the year.

According to him, the works will increase the integration of the North and Northeast regions with the rest of the SIN (National Interconnected System).

“With this, it is strategic to expand Brazil’s capacity to generate clean and renewable energy, more specifically that generated in the Northeast region. This is a very positive result for Brazil, after all the electrical system needs continuous expansion”, stated Zanetti.

Thais Araújo, general coordinator of Transmission Planning replacing MME's DPOTI, presented the energy planning for the next 10 years. 

“Wind and solar generations are expected to grow by 30%, while thermoelectric generation generated by fossil fuels and nuclear will decrease by around 27%,” said the coordinator.

Furthermore, she recalled that 50% of the Brazilian energy matrix is ​​renewable energy, placing the country in a favorable situation.

Araújo and Zanetti's speeches took place during the workshop da ANEEL (National Electric Energy Agency) for clarification on the transmission line auction. 

The event also included the participation of MME, EPE (Energy Research Company) and ONS (National Electric System Operator).

Electric energy transmission is expected to grow 20% over the next 10 years, according to the PDE (Ten-Year Energy Expansion Plan) forecast.

EPE studies indicate the addition of 41 thousand km of transmission lines by 2032. With this, Brazil would reach 220 thousand km of transmission lines throughout the territory

About the Auction

The first auction of this year, scheduled for March, is expected to bid for another 6.400 km of transmission lines. In addition, there will be concessions for sectioning and 9.200 MVA in transformation capacity in substations.

The service concessions will cover 13 states. They are: Alagoas (AL), Bahia (BA), Mato Grosso do Sul (MS), Maranhão (MA), Minas Gerais (MG), Paraíba (PB), Pernambuco (PE), Piauí (PI), Rio de Janeiro (RJ), Rio Grande do Norte (RN), Santa Catarina (SC), São Paulo (SP) and Tocantins (TO). The lines will make up the SIN’s basic network. 


all the content of Canal Solar is protected by copyright law, and partial or total reproduction of this site in any medium is expressly prohibited. If you are interested in collaborating or reusing part of our material, please contact us by email: redacao@canalsolar.com.br.

Frederico Tapia
About the Author
Frederico Tapia

Journalism student at UNESP on the Bauru campus. She has experience in producing journalistic articles.

Comments

Comments are moderated before publication.

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

Leave your comment

Canal Solar
Privacy

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.