GC Solar 23.61 GW GD Solar 53.65 GW
Market & Investments

Northeast will receive four photovoltaic plants with a capacity of over 12 MWp

The projects scheduled for April 2025 have an investment of R$67 million in three states

Northeast will receive four photovoltaic plants with a capacity of over 12 MWp

Together, the projects have the capacity to supply between 6 and 7,2 homes. Photo: Freepik

Photovoltaic projects with an installed capacity of over 12 MWp, enough to supply between 6 and 7,2 homes, will be completed by April 2025 in the states of Bahia, Ceará and Pernambuco.

With an investment of R$ 67 million, GDSUN is implementing four solar projects in Northeast: Caracara (CE), Alliance (PE), Barra do Arara (BA) and Luiz Eduardo Magalhães 2 (BA). 

With areas ranging from 42 to 99 square meters, the plants were designed to operate with solar modules, trackers and inverters.

Check out the characteristics of each of them below: 

Caracara (CE): the plant will have an installed capacity of 3.301 MWp in an area of ​​60 thousand m², with 5.040 photovoltaic modules and 90 trackers;

Alliance (PE): will have 2.751 MWp, an area of ​​42,3 thousand m², in addition to being composed of 4,2 thousand photovoltaic modules and 120 trackers;

Arara Bar (BA): will have a capacity of 2.751 MWp, with an area of ​​60 thousand m², in addition to 4,2 thousand photovoltaic modules and 120 trackers.

Luiz Eduardo Magalhães 2 (BA): UFV will have 3.301 MWp, an area of ​​99,5 m², in addition to 5.040 photovoltaic modules and 168 trackers.

According to Simone Suarez, CEO of GDSUN, around 70 to 120 direct and indirect jobs will be created throughout the implementation of the solar plants, involving teams specialized in engineering, logistics, supplies and construction.

“With this milestone, we reinforce the positive socio-environmental impact of the projects, consolidating our contribution to a cleaner and more accessible energy matrix,” he says. 

Implementation involves logistical challenges, such as transporting materials to remote locations and the need for detailed planning to ensure efficient execution of the works.

Currently, GDSUN has 73 plants installed in 13 Brazilian states, with a total operational capacity of 185 MWp.

all the content of Canal Solar is protected by copyright law, and partial or total reproduction of this site in any medium is expressly prohibited. If you are interested in collaborating or reusing part of our material, please contact us by email: redacao@canalsolar.com.br.

Emily Castro
About the Author
Emily Castro

Graduating in Journalism from the Pontifical Catholic University of Campinas, she has experience in producing articles for news portals, radio and podcasts. She also works as a producer for the Papo Solar Podcast and the Solar em 60 and Estude com o projects. Canal.

Comments

Comments are moderated before publication.

Comments should be respectful and contribute to a healthy debate. Offensive comments may be removed. The opinions expressed here are those of the authors and do not necessarily reflect the views of the author. Canal Solar.

Leave your comment

Canal Solar
Privacy

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.